Skip to content
Meisterwerk

Projects

Stores built for the maisons

Scope, location and year for each. Names appear where the maison has granted permission; the rest are anonymised, with the work intact.

IWC Schaffhausen, Solitaire Mall, Riyadh

IWC Schaffhausen

Facade, civil and MEP works for IWC Schaffhausen at Solitaire. The shopfront is black powder-coated aluminium with full-height lamellas and crystal-clear laminated glass; inside, white paint and grey skimcoat are set against vertical timber slats in the VIP room, with Bianco Statuario display walls standing out from the darker marble behind them. Delivered against the maison’s own store manual rather than a local reading of it.

Solitaire Mall, Riyadh
Facade, civil and MEP works
Completed
2024

Jaeger-LeCoultre, The Dubai Mall

Jaeger-LeCoultre

A refined retail fit-out executed with precision and meticulous attention to detail — seamless architectural detailing, premium finishes and fully coordinated MEP services in harmony with the maison’s identity. The curved, back-lit ceiling rafts are the difficult part of a room like this: they are read against a straight shopfront line from every angle on the mall side, so the setting out has to be right before a single panel is hung.

The Dubai Mall
Facade, civil and MEP works
Completed
2024